A cargo vessel went to anchor and commenced pumping out ballast water from No1C Water Ballast Tank (WBT) to adjust its trim before a canal transit the following day. Shortly before pumping was completed, the bilge alarm for cargo hold No. 5 WBT activated. The Chief Officer instructed an ordinary seaman to take soundings of the hold bilge, which revealed 0.5m of water in the bilge.
The vessel successfully transited the canal and berthed alongside at 1700. Cargo operations were to commence at 1900. No cargo movements were planned in hold No. 5 at this port.
At 1800 the Chief Officer instructed the duty engine room watchkeeper to transfer ballast water from No. 1 WBT to No. 5 WBT which was situated below cargo hold No. 5.
Shortly after starting, the hold bilge alarm sounded so the transfer of ballast water was stopped. No crew member was directed to investigate why the alarm had sounded; instead, the alarm was accepted, and the water transfer system reconfigured to pump out the hold. Ballast water transfer subsequently restarted but approximately 15 minutes later the No. 5 hold bilge’s “Low insulation” alarm sounded. The ballast operation stopped once again while the ship’s electrician was despatched to investigate. On arrival they found that the hold was flooded to a height of 1.70 m.
Flooded cargo hold
The incident was reported to the Master and portable emergency pumps deployed.
The next day the Chief Officer, Bosun and an AB entered Hold No. 5 to confirm that the water had been drained. When cargo operations resumed, 26 flood-damaged containers from Hold 5 had to be transferred ashore. During the inspection various hand tools (screwdrivers, hammer, and pieces of an old gasket) were discovered in the hold.
An investigation confirmed that the bilge and ballast system valves were in good condition, and the structural integrity of the cargo hold was intact. It concluded that water had entered the hold from a manhole that had not been properly secured following work within the double bottom tank. It was noted that the inadequate reaction by the crew when the bilge alarm was activated was a contributing factor to the incident.
This report raises several serious points:
Alerting – Do you always speak up when you should? If not, why?
Communications – The alarms indicated a deviation from the norm. Do not assume that all is well; check.
Teamwork – Encourage challenges to ‘group think’: has anyone checked the hold bilges? The tools left from the previous work indicated that the job was incomplete. A proper post-work inspection was not carried out.
Report Ends………….